Friday, August 24, 2007

With a little help from the man above

With the help of a local baptist preacher, I have managed to now get all my raised bed steaks bashed in and i can now start screwing in the sides of the raised beds and re-establish the paths.

So i already had

3 beds 2ft by 10ft ( each bed will need 0.4 cubic yards of dirt )
4 beds 4ft by 4ft ( each bed will need 0.3 cubic yards of dirt )
1 beds 3ft by 3ft ( each bed will need 0.2 cubic yards of dirt )
9 beds 4ft by 10ft ( each bed will need 0.7 cubic yards of dirt )

Now i have in addition

3 beds 4ft by 8ft ( each bed will need 0.6 cubic yards of dirt )
6 beds 3ft by 10ft ( each bed will need 0.6 cubic yards of dirt )
3 beds 4ft by 10ft ( each bed will need 0.7 cubic yards of dirt )
3 beds 3ft by 4ft ( each bed will need 0.2 cubic yards of dirt )

which all need filling.

(calculating how much compost i need i used http://yardscut.com/how-much-dirt.htm)

No comments: