With the help of a local baptist preacher, I have managed to now get all my raised bed steaks bashed in and i can now start screwing in the sides of the raised beds and re-establish the paths.
So i already had
3 beds 2ft by 10ft ( each bed will need 0.4 cubic yards of dirt )
4 beds 4ft by 4ft ( each bed will need 0.3 cubic yards of dirt )
1 beds 3ft by 3ft ( each bed will need 0.2 cubic yards of dirt )
9 beds 4ft by 10ft ( each bed will need 0.7 cubic yards of dirt )
Now i have in addition
3 beds 4ft by 8ft ( each bed will need 0.6 cubic yards of dirt )
6 beds 3ft by 10ft ( each bed will need 0.6 cubic yards of dirt )
3 beds 4ft by 10ft ( each bed will need 0.7 cubic yards of dirt )
3 beds 3ft by 4ft ( each bed will need 0.2 cubic yards of dirt )
which all need filling.
(calculating how much compost i need i used http://yardscut.com/how-much-dirt.htm)
Friday, August 24, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment